In-shop Molding Making
Top notch molds for plastic injection molding
Our tooling department is posed to provide all professional and strong supports neccessary for the massive production you need.
Our Capacity
Geared for massive production for your massive sales
30+
Builds Monthly
High Capacity to keep up with the demand
19+
Years Experiences
Dedication and experiences enable us to cope with all the chanllenges
26Ds
Quick Turnover
Average T0 samples in 26 days, quick turnover
8hrs
Response
We are happy to answer any question you have in time
1
Contact us
Reach our team with your design files and requirements
2
Free Quote
We usually quote in 7-32 hrs for your project.
3
Free Analysis
A detailed moldflow analysis would be available before tooling, so we could solve the potential issues in design stage.
4
Final Drawings
Optimize the design and submite the final drawings for tooling
5
Tooling
Typically 20-36 days to finish
6
Sampling
T0 samples for structure test; T1-T2 samples come with texture and proper colors
7
Confirmation
Samples confirmation from you is neccessary
8
Small Run
1st run for few hundreds
9
Massive Production
Production in thousands or even in millions.